Cement Vertical Ultrafine Mill Working Principle

Psted On 2017-12-27 20:47:50
Cement Vertical Ultrafine Mill Working Principle

Cement vertical Ultrafine Mill is the most important equipment in the preparation of aerated concrete material is cement vertical grinding, which is used for grinding of lime, gypsum, sand, slag and other materials. Only after grinding and material requirements can be fully mixed fineness interaction, in order to make the products reach strength, grinding is an important process in production of aerated concrete, the grinding process of large power consumption, cement Ultrafine Mill is the general equipment factory in the motor capacity of aerated concrete.

Cement vertical Ultrafine Mill is simplified by horizontal feeding and grinding head, hollow shaft and other parts, simplified for long cylinder, the cylinder equipped with grinding body, cylinder body for steel manufacturing, steel lining plate and the fixed body is simplified, grinding steel balls, and loaded into the cylinder according to different diameter and a certain proportion in the grinding body section is also available,

To choose according to the granularity of the abrasive material grinding material from the feed end of the hollow shaft is installed in the cylinder body, when the cement Ultrafine Mill simplified rotation when the grinding body due to inertia and centrifugal force, friction force, making it a post near the cylinder liner cylinder was taken away, when they were brought to a fixed height, due to its own gravity and dropped, the grinding body falling like a projectile like the material in the barrel to break.

The material is evenly and evenly entered into the vertical grinding chamber through the feeding hollow shaft through the feeding device. There are stepped lining plates or corrugated lining plates in the warehouse, and different sizes of steel balls are mounted inside. The cylinder rotates to generate centrifugal force, which will bring the steel balls to a certain height and then fall down, which will cause heavy impact and abrasive effect on the materials. After the material is grinded in the silo, the material is entered into second storehouses through a single layer septum plate. The silo is inlaid with a flat plate with steel ball in the silo, and the material is further grinded. The powdery material is discharged through the discharge grate plate, and the grinding operation is completed.